Description
REINFORCED CONCRETE:
Reinforced concrete carcass system will be made in accordance with the static projects approved by the Chamber of Civil Engineers. Concretes will be poured according to the concrete classes foreseen in the project by Korman Beton Ltd., which belongs to our group. The construction irons to be used will be tested in laboratories before use. Formwork systems will be made with clean plywood materials.
WALLS:
All walls will be manufactured using special ecotherm bricks (brick with high heat insulation properties) and will be made in accordance with 1st Class workmanship. Steel lintels will be used on doors and windows.
PLASTER WORKS:
Interior and exterior facades will be cemented 2nd hand black plaster and 3rd hand cemented ready-made plaster.
SUSPENDED CEILING COVERINGS:
Suspended ceilings will be made in the places specified in the project. Suspended ceilings will be made with moisture-resistant green plasterboards in WC shower spaces. On the ceilings on the exterior, wooden patterned special facade panels (hekimboard or similar features) and exterior-resistant suspended ceilings will be made.
PAINTING WORKS:
On the interior walls and ceilings, there will be wipeable silicone special plastic paint. Acrylic exterior paint will be made on the exterior walls.
FLOORING and WALL COVERINGS:
All volumes will be covered with screed and the porcelain ceramics to be laid on it will be of first class quality and in sizes suitable for interior architectural plans. The skirtings of these spaces will be suitable for the flooring material.
The wall tiles of spaces such as WC, Shower and Kitchen will be made in accordance with the interior architectural plans. The showers will have modern special chrome filters and will be made with floor ceramics.
High quality ceramic, marble, granite and special materials will be laid on the stair halls and steps. Skirtings will also be made from the same materials on the steps.
Thresholds and sills will be quality marble or granite.
WOODEN DOORS and CABINETS:
Interior doors in the apartments will be MDF framed and plain color painted press panel doors.
Apartment entrance doors will be high quality doors. Door handles, locks and hinges will be of 1st Class quality.
CABINETS and KITCHEN COUNTERS:
Kitchen counters and cabinets will be PVC edge banded, with sufficient number of drawers and opening wings, melamine coated chipboard, and worktops will be porcelain worktops. Drawer rails will be soft stoppers and bases will be aluminum, there will be plate racks, spoon racks and wastebaskets.
Kitchen counter top cabinets and laundry cabinets will be opening and bedroom cabinets (sliding wings) will be in the same way Melamine coated chipboard PVC edge banded opening wing model. There will be sufficient number of drawers, shelves and clothes hanger rails in the cabinets.
SINK, WC, SHOWER and MIXERS
Sinks, depending on the project, will be countertop 1st Class quality Duravit, Vitra or similar, WCs will be built-in Duravit, Vitra or similar. Showers will be made of ceramic laid on the floor and will have a chrome filter. All mixers to be used will be Hansgrohe or similar.
Kitchen sinks will be 1st Class quality suitable for the project and mixers will be Hansgrohe or similar.
EXTERIOR DOORS, WINDOWS and FACE COVERINGS:
All exterior doors and windows will be heat insulated aluminum and double glass. Aluminum to be used will be anthracite color. Aluminum facade composite coatings will be covered with Alucobond or similar material.
ALUMINUM AND GLASS RAILINGS:
Aluminum railings will be used on the interior stairs and glass railings will be used on the balconies and terraces on the exterior.
WATER AND HEAT INSULATION MATERIALS:
Cement-based insulation (SIKA-BASF) will be made in WC bathroom volumes.
All insulation materials to be used in all open and closed terraces, WC and shower volume floors, balcony areas, roof terraces, swimming pools etc. will be (SIKA-BASF) products.
XPS foam material will be used as heat insulation on roof terraces.
ELEVATORS:
Elevators starting from the basement floors and going up to the terrace floor level will be Kone, Schindler or similar.
SWIMMING POOL:
High-quality modern pool ceramics will be used in the pool with an overflow model suitable for its project.
PAVEMENT AND ASPHALT COATINGS:
The pavements seen in the project will be paved in accordance with the laws of the Kyrenia Municipality. The pocket to be built on the roadside will be asphalted in accordance with the laws.
ELECTRICAL WORKS:
1. The electrical installation has been designed in accordance with BS Standards, 16th Regulation and KIBTEK rules.
2. A central generator system has been designed for all apartments and common areas against power outages. The system is supported by a generator that automatically starts operating to provide uninterrupted energy.
3. The building automation, lighting, air conditioning and energy management systems are designed to be remotely controlled and provide energy saving. An automation infrastructure will also be made for curtains. Users,